|

Abbreviations / Stitch Glossary

Abréviations en Français Abreviaturas en Español
U.S. Knitters please note: Canadian and American terminologies differ slightly. Equivalents are shown.
Canadian U.S.
yfwd yarn over (yo)
tension gauge
cast off bind off

alt alternate(ing) P purl
approx approximately P2tog purl two stitches together
beg beginning P3(4,n)tog Purl next 3(4, n) stitches together.
C4B Slip next 2 stitches onto cable needle and leave at back of work. K2, then K2 from cable needle P2togtbl purl 2 stitches together through back loops
C4F Slip next 2 stitches onto cable needle and leave at front of work. K2, then K2 from cable needle pat pattern
ch chain psso pass slipped stitch over
CL K2tog. Keep stitches on left-hand needle. P2tog into the same stiches. Slip off left-hand needle rem remain(ing)
cm centimeter(s) rep repeat
co cast on reverse sc reverse single crochet
cont continue(ity) rnd(s) round(s)
dc double crochet RS right side
dcbp

Yoh and draw up a loop around post of next st at back of work inserting hook from right to left. (Yoh and draw through 2 loops on hook) twice - 1 dcbp made.

sc single crochet
Dcfp

Yoh and draw up a loop around post of next st at front of work inserting hook from right to left. (Yoh and draw through 2 loops on hook) twice - 1 dcfp made.

Sl st Slip stitch
dec decrease(ing) Sl1 Slip next stitch knitwise
dtr double treble Sl1P Slip next stitch purlwise
Dtrfp (Yoh) 3 times and draw up a loop around post of next stitch at front of work 2 rows below inserting hook from right to left. (Yoh and draw through 2 loops on hook) 3 times.
sp(s) space(s)
g gram(s) ssk Slip next 2 stitches one at a time, then knit through back loops together.
hdc half double crochet st st stockinette stitch
inc increase 1 stitch by knitting into front and back of next stitch st(s) stitch(es)
K knit tog together
K1B knit into next stitch 1 row below tr treble crochet
K2tog Knit 2 stitches together WS wrong side
K2togtbl Knit 2 stitches together through back loops yb bring yarn into back of work
K3(4,n)tog Knit next 3(4, n)stitches together yf bring yarn into front of work
M1 Make 1 stitch by picking up horizontal loop lying before next stitch and knitting into back of loop. yfwd yarn forward (makes 1 extra stitch)
M1P Make 1 stitch by picking up horizontal loop lying before next stitch and purling into back of loop. yo yarn over the needle (makes 1 extra stitch)
MB Make bobble: [(K1. yfwd) 3 times. K1] all in next st. Turn. P7. Turn. Sl1. K1. psso. K3. K2tog. Turn. P2tog. P1. P2togtbl. Turn. Sl1. K2tog. psso - bobble made Yoh yarn over the hook
mm
millimeter(s) yrn yarn round needle (makes 1 extra stitch)
oz ounce(s)