Learn to Knit Instructions (pdf)
Click here for Learn to Crochet Instructions
Casting On
 |

|
 |
1a Make a slip knot:
Loop the yarn as shown and slip needle under the lower strand of the loop.
1b Pull up a loop of yarn. |
2 Pull the yarn end attached to the ball of yarn to tighten the slip knot leaving the other end approx 4 inches [10 cm] long. Transfer needle to left hand. |
3a Insert the right-hand needle through slip knot and wind yarn over right-hand needle.
3b Pull loop through slip knot. |
 |
 |
 |
| 4 Place new loop on left-hand needle. (You now have 2 stitches (sts) on your left-hand needle). |
5 Insert right-hand needle between last 2 stitches (sts) on left-hand needle and wind yarn over right-hand needle. |
6 Pull loop through. Place this new loop on left-hand needle beside last stitch (st). (You now have 1 more stitch on left-hand needle). Repeat (rep) steps 5 and 6 until required number of stitches (sts) have been cast on left-hand needle. |
The Knit Stitch
1 Hold the needle with cast on stitches (sts) in your left hand, and the loose yarn attached to the ball at the back of work. Insert right- hand needle from left to right through the front of the first stitch (st) on the left-hand needle.
|
2 Wind the yarn from left to right over the point of the right-hand needle.
|
3 Draw the yarn through this original stitch (st) which forms a new stitch (st) on right-hand needle.
|
|
4 Slip the original stitch (st) off the left-hand needle, keep- ing the new stitch (st) on the right-hand needle.
|
5To knit a row, repeat steps 1 to 4 until all stitches (sts) have been transferred from left-hand needle to right-hand needle. Turn the work by transferring the needle with stitches (sts) into your left hand to knit the next row. |
|
The Purl Stitch
 |
 |
 |
1 With yarn at front of work, insert right-hand needle from right to left through front of first stitch (st) on left-hand needle.
|
2 Wind yarn around right-hand needle. Pull yarn through stitch (st). |
3 Slip original stitch (st) off needle. Repeat (rep) these steps until all stitches (sts) on left-hand needle have been transferred onto right-hand needle to complete one row of purling.
|
Increasing and Decreasing
 |
 |
 |
Increase 1 stitch (st) in next stitch (st) Work into front and back of stitch (st) as follows: Knit stitch (st), then before slipping it off needle, twist right-hand needle behind left-hand needle and knit again into back of loop. Slip original stitch (st) off needle. There are now 2 stitches (sts) on right-hand needle made from original stitch. |
K2tog Decrease Knit 2 stitches (sts) together (tog) through the front of both loops. |
P2tog Decrease Purl 2 stitches (sts) together (tog) through the front of both loops. |
Casting Off
|
Cast off using knit stitch (knitwise) Knit the first 2 stitches (sts). *Using left-hand needle, lift first stitch (st) over second stitch (st) and drop it off between points of the 2 needles. Knit the next stitch (st); repeat (rep) from * until all stitches (sts) from left-hand needle have been worked and only 1 stitch (st) remains on the right-hand needle. Cut yarn (leaving enough to sew in end) and thread cut end through stitch (st) on needle. Draw yarn up firmly to fasten off last stitch (st). |

|
Cast off using purl stitch (purlwise) Purl first 2 stitches (sts). *Using left-hand needle, lift first stitch (st) over second stitch (st) and drop it off needle. Purl next stitch (st); repeat (rep) from * securing the last stitch (st) as described for casting off knitwise. |